Ravi, like many project(1),had studied the waterfall model of softwaredevelopment as the primary software life-cycle(2).He was all set to use it for an upcoming project, his first assignment. However, Ravi found that the waterfall model couldnot be used because the customer wanted the software delivered in stages, something that implied that the system had to be delivered and built in (3) and not as(4).
The situation in many other projects is not very different. The real world rarely presents a problem in which a standard process, or the process used in a previous project, is the best choice. To be the most suitable, an existing process must be(5)to the new problem.
A development process, even after tailoring, generally cannot handle change requests.To
accommodate change requests without losing control of the project, you must supplement the development process with a requirement change management process.
(1)
A.customers
B.managers
C.users
D.administrators
(2)
A.activity
B.procedure
C.process
D.progress
(3)
A.parts
B.modules
C.software
D.a whole
(4)
A.parts
B.modules
C.software
D.a whole
(5)
A.modified
B.used
C.suited
D.tailored
10年專注信管,信管教育專注者,信管網(wǎng)優(yōu)勢(shì)
免費(fèi)試聽信管網(wǎng)信息系統(tǒng)項(xiàng)目管理師課程
全國(guó)前50名高分學(xué)員訪談:董麗(174)、李思...
信息系統(tǒng)項(xiàng)目管理師高端班培訓(xùn)課程
信管老師100小時(shí)直播課程
軟考報(bào)名專題(報(bào)名時(shí)間、入口等)
中級(jí)系統(tǒng)集成項(xiàng)目管理工程師通關(guān)課程
系統(tǒng)規(guī)劃與管理師課程(考試介紹與題型分析)
軟題庫(kù):軟考在線題庫(kù)、支持手機(jī)答題