試題1
()is the process of monitoring the status of the project to update the projects costs and managing changes to the cost baseline.查看答案
試題參考答案:A
試題2
下述關(guān)于項(xiàng)目合同索賠處理的敘述中,不正確的是( )。
A.按業(yè)務(wù)性質(zhì)分類,索賠可分為工程索賠和商務(wù)索賠
B.項(xiàng)目實(shí)施中的會(huì)議紀(jì)要和來(lái)往文件等不能作為索賠依據(jù)
C.建設(shè)單位向承建單位要求的賠償稱為反索賠
D.項(xiàng)目發(fā)生索賠事件后一般先由監(jiān)理工程師調(diào)解
查看答案
試題參考答案:B
試題3
關(guān)于項(xiàng)目招投標(biāo)的說(shuō)法,不正確的是()。查看答案
試題參考答案:A
試題4
系統(tǒng)集成合同管理是管理建設(shè)方和承建方的關(guān)系,保證承建方的實(shí)際工作滿足合同要求的過(guò)程,其內(nèi)容不包括()
A、合同簽訂管理
B、合同履行管理
C、合同變更管理
D、合同違約管理
查看答案
試題參考答案:D
試題5
()includes the process for incorporating the organization's quality policy regarding planning managing and controlling project and product quality requirements in order to meet stakeholders’objectives.查看答案
試題參考答案:D
試題6
依據(jù)《中華人民共和國(guó)招標(biāo)標(biāo)法》,公開(kāi)招標(biāo)是指招標(biāo)人以招標(biāo)公告的方式邀請(qǐng)( )投標(biāo)。
A. 特定的法人或者其他組織
B. 不特定的法人或者其他組織
C. 通過(guò)競(jìng)爭(zhēng)性談判的法人或者其他組織
D. 單一來(lái)源的法人或者其他組織
查看答案
試題參考答案:B
試題7
Managing risk and documenting them is very important in project planning process. You are in the process of defining key risks, including constraints and assumptions, and planned responses and contingencies. These details will be included in the( )
A. project management plan
B. project baseline
C. risk response plan
D. risk baseline
查看答案
試題參考答案:A
試題8
All of followings should be done by the project manager during project control except ( ).
A、Determine that a change has occurred
B、Ensure that a change is agreed
C、Make sure all changes are approved by management
D、Manage changes as they occur
查看答案
試題參考答案:C
試題9
Schedule development can require the review and revision of duration estimates and resource estimates to create an approved( )that can serve as a baseline to track progress.
A.scope statement
B.a(chǎn)ctivity list
C.project charter
D.project schedule
查看答案
試題參考答案:D
試題10
當(dāng)()時(shí),合同可能認(rèn)定為無(wú)效
A.合同甲乙雙方損害了社會(huì)共同利益
B.合同標(biāo)的規(guī)格約定不清
C.合同中缺少違約條款
D.合同中包括對(duì)人身傷害的免責(zé)條款
查看答案
試題參考答案:A
信管網(wǎng)訂閱號(hào)
信管網(wǎng)視頻號(hào)
信管網(wǎng)抖音號(hào)
溫馨提示:因考試政策、內(nèi)容不斷變化與調(diào)整,信管網(wǎng)網(wǎng)站提供的以上信息僅供參考,如有異議,請(qǐng)以權(quán)威部門(mén)公布的內(nèi)容為準(zhǔn)!
信管網(wǎng)致力于為廣大信管從業(yè)人員、愛(ài)好者、大學(xué)生提供專業(yè)、高質(zhì)量的課程和服務(wù),解決其考試證書(shū)、技能提升和就業(yè)的需求。
信管網(wǎng)軟考課程由信管網(wǎng)依托10年專業(yè)軟考教研傾力打造,教材和資料參編作者和資深講師坐鎮(zhèn),通過(guò)深研歷年考試出題規(guī)律與考試大綱,深挖核心知識(shí)與高頻考點(diǎn),為學(xué)員考試保駕護(hù)航。面授、直播&錄播,多種班型靈活學(xué)習(xí),滿足不同學(xué)員考證需求,降低課程學(xué)習(xí)難度,使學(xué)習(xí)效果事半功倍。
發(fā)表評(píng)論 查看完整評(píng)論 | |